Skara Brae — Work Items List

# Issue Work Item Iteration PSP level Est. N (LOC) Act. N (LOC) Est. time (min) Act. time (min) Status
1 skara-brae-server#1 Injectable RNG (plan item #8) I1 PSP1.0 35 (pred. 42, PI 37–73) 41 105 (PI 75–135) 90 Done — both actuals inside 70% PI (size −2.4%, time −14%)
2 skara-brae-server#2 Architecture cleanup + OpenUP work set (plan item #7) I1 PSP1.0 660 (pred. 951, PI 607–1295) — 620 (PI 455–785) — Open — typed responses, run_adventure extraction, constants, unwrap, fmt baseline; full OpenUP work set (Vision, UC, Suppl. Specs, A&D, Test Cases)

Notes:

  • Estimates filled during PLN (PROBE); actuals during PM postmortem.
  • Iteration I1 = first Skara Brae iteration (starts with this WI).
  • OpenUP work products live at the project top folder (docs/openup/), not per-repo.